 |
 |
| Master Bath Remodel |
|
This 250 sq ft master bath project was a COMPLETE remodel. The remodel took only 3 weeks to complete! For the vanities, we installed walnut cabinets and granite counters, with undermount sinks and chrome fixtures. 4 " Halogen recessed lighting surrounded the ceiling. Mosaic 2" X 2" Travertine tile on the floor and in and around the shower, replaced the old ceramic tile and carpeting. Finally, a full size jaccuzzi, and dual shower head shower were added to complete this spa feeling master bath. |
|
| | |